Northgate Foods / Dashboard
CompanyNorthgate Foods Inc.

Dashboard

Monday, November 23, 2026 · Day shift · All 5 food packaging sites
North Bay Line 2 is down. Flow wrapper sealing jaw failure — BD-2481 in progress, ETA back in service 2:00 PM. All other packaging lines running.

Work Orders by Category

Every job is filed as PM, CB or BD by how it was created — tap a card to filter the board

Work Order Governance — Closure

Complete is not closed — a completed job must be reviewed and moved to Closed within 30 days of completion

Financials — Budget at a Glance

All parts are expensed at purchase · completed work order cost = parts + service

Active Work Orders

Work OrderPriorityStatusAssignedDue

Asset Health

Downtime by Site — Last 7 Days

UnplannedPlanned

PM Plans — Due & Near Limit

Orders by Status

Backlog is trending down for the third straight week. On-hold orders are mostly waiting on parts — see Stores.

Work Orders

Categorised by origin — PM preventive maintenance generated from plans · CB condition based, created from inspection findings · BD breakdown, created for breakdown failures. Tap any row for full detail. Every PM and CB job carries an estimated duration for planning — jobs a plan generates inherit the plan's estimate, and the category cards total the planned hours. Each row also shows the job's material status, rolled up from its parts: Ready (no parts or PO requirement) · On Hand (has materials, all on hand) · Open Requirement (a requirement is neither on hand nor on a PO) · On Order (requirements covered by an open PO). Governance: a job marked Complete is not finished — it must be reviewed and moved to Closed within 30 days of completion.
Category
Work OrderCategoryPriorityStatusAssignedDue

Work Requests

The intake step before a work order. Anyone signed in can raise a request — operators report problems here — and a Planner, Site Lead or Corporate reviews it: an approved request is converted into a real work order, a declined one records why. Requests carry their own numbers — WR-1001, WR-1002, … — separate from the PM / CB / BD work order series. Tap any row for the full request.
RequestRequested byDatePriorityFlagsStatus

Schedule — Gantt

Assets down the side, time across the top. Use the Days / Weeks / Months toggle to change the horizon — Days shows 14 days in detail, Weeks rolls 12 weeks up by week, Months shows 6 months at a glance. Solid bars are scheduled work orders, coloured by category — PM preventive · CB condition based · BD breakdown. Dashed bars are PM jobs the plans will generate. Tap any solid bar to open the work order.
View
PM — Preventive CB — Condition Based BD — Breakdown Planned PM — not yet generated Completed Striped bar = on hold · Shaded column = today (Days) or the week / month containing today (Weeks / Months) · Grey columns = weekend (Days view)

Asset Register

Drill-down hierarchy — Plant → Area → Asset, and Plant → Area → Line → Asset in Manufacturing (A–Z at each level). 45 registered · 5 plants × (3 lines in Manufacturing + 4 Utilities + 2 Building and Grounds) · starts at plant level — tap a plant, area or line to drill down, and tap any asset for its full record.
Hierarchy 0 · Company Northgate Foods 1 · Plant / Site 2 · Area Utilities · Manufacturing · Building and Grounds 3 · Line Manufacturing only 4 · Asset
Drill down: tap a plant to open its areas, an area to open its lines or assets, a line to open its assets — and tap any asset to open its full record.

PM Plans & Auto Work Orders

Every asset carries a full calendar plan set — Weekly, Monthly, Quarterly, Semiannual and Annual jobs — plus its run-hour, temperature and measurement plans where they apply. When a schedule hits — or a reading crosses its limit — a PM-category work order is generated automatically. Recurring calendar PMs are generated ahead and already sit on the board: inspections at least 4 weeks ahead and PMs that need parts at least 8 weeks ahead, so parts can be ordered in time. CB jobs come from inspection findings (5–10 per asset in the current board); BD jobs are raised for breakdown failures.
1 · Preset plan sits on the assetInterval, meter limit, assigned tech, priority, parts and safety note are set once — no re-typing each time.
2 · Schedule or reading is checkedCalendar dates daily; run hours, temperature and measurements every time a reading is logged.
3 · Work order auto-generatesCreated with the plan's title, tech, priority and lead time. Calendar plans pre-generate their recurring jobs — inspections 4 weeks ahead, PMs with parts 8 weeks ahead — and each plan card shows how many of its work orders are already on the board.

Preset Plan Library

Tap a preset to create a new plan from it — or use New PM Plan
◷ Schedule

Calendar Inspection

Weekly, monthly, quarterly, semiannual or annual — every asset carries all five. For statutory checks, safety inspections and lubrication rounds.

Lead: 3 days before dueUsed on 231 plans
◉ Run Hours

Run-Hour Service

Counts meter hours, not calendar days. For compressors, fillers, sealers, wrappers and CIP services.

Lead: at 90% of intervalUsed on 4 plans
△ Temperature

Temperature Watch

Fires when a logged temperature goes over (or under) the asset limit — sealing jaws, motors, chillers and boilers.

Lead: immediateUsed on 4 plans
≋ Measurement

Vibration & Measurement Route

Fires on any measured value: vibration mm/s, pressure, chain elongation %, oil condition, thickness.

Lead: immediateUsed on 4 plans
◷ Schedule

Lubrication Round

Fixed-interval greasing and oil top-up with the points, grease type and quantity pre-listed on the job.

Default: monthlyUsed on 3 plans
≋ Measurement

Condition Check

Operator or tech records a reading on a route; outside the normal band auto-raises an inspection job.

Band set per assetUsed on 3 plans

Upcoming — Next Generated Jobs

From active plans, next 14 days

Material Master List

Central stores — the material master for all 5 food packaging sites. Each part carries its own internal part number and — as a separate field — the manufacturer part number, min / max stock levels, and a current price taken from its last purchase. Items at or below the reorder point are flagged for purchasing. Select any part to open its Material Master record.

Parts Master

Current price = price paid on the last purchase · receiving a PO updates it
PartInternal Part #Mfr Part #BinStock · Min / MaxCurrent Price — Last PurchaseStatus
Red tick on the stock bar = min stock levelDark tick = reorder pointBar fills to the max stock level

Cycle Counts

The rolling count programme for Central Stores: count a scope, enter what is actually on the shelf, and post to adjust stock to the counted quantities. Every part is counted at least once every 12 months.

Count Documents

Create a document → enter counts line by line → Post adjusts Stores stock to the counted quantities

Purchase Orders

Every purchase order for the 5 food packaging sites. Drafts stay here — editable — until submitted; receiving a PO adds its quantities to Stores stock and expenses its lines in the Expense Ledger. Job requirements that no PO covers yet live on the Requirements page.

Purchase Orders

Drafts live here until submitted · receiving a PO adds its quantities to Stores stock

Requirements

Requirements Awaiting PO — every uncovered requirement on open work orders in the site scope: parts in Material Shortage and external service that no purchase order covers yet. Create PO from a row opens the New Purchase Order form pre-filled; creating the PO covers the requirement and clears it from this list.

Suppliers

Supplier master data for every supplier Northgate Foods trades with — the roster is derived from the parts master (vendors and manufacturers) and the purchase orders on record. Select a supplier to open its master data sheet. Contact details shown are demonstration data for this mockup.

Suppliers

Budgets

Financials · Maintenance money for FY2026 (Jan 1 – Dec 31, 2026), year to date to Nov 23, 2026. Budgets are tracked by area — Manufacturing, Utilities, Building and Grounds and Central Stores. Every figure follows the site selector at the top — budgets are annual and company-wide, spend narrows to the site in view.
Accounting rule — all parts are expensed at purchase. The full cost of a purchase hits the expense ledger when the PO is received, whether the line is Stock (goes on the shelf in Stores), Direct (bought for a specific job) or Service (external labour for a specific job — receiving it charges that job's service cost, and the PO is the service cost's reference). Stock on hand is tracked in units for operations — it carries no book value here. Work order cost (on the Work Order Costs page) is cost attribution (where the money ended up, by asset and area), not a second expense — never add the two together.

Budget Tracking — FY2026 by Area

Annual budget and reforecasted budget vs purchases expensed · the dark tick is where the year should be by Nov 23 (11 of 12 months ≈ 92%)

Spend by Area

Financials · Purchases expensed at purchase for FY2026, year to date to Nov 23, 2026, broken down by area — each area shown separately with its Stock / Direct / Service detail below. Every figure follows the site selector at the top.

Spend by Area

Stock purchasesDirect purchasesService purchasesPurchases expensed at receipt, ex-HST

Area Detail — Each Area Separately

The same spend, one card per area: category split, share of spend, and budget position

Monthly Spend — Expensed at Purchase

Ledger months with purchases in the current site scope. The year's earlier purchases sit in the Expense Ledger.

Spend by Asset

Financials · Purchases attributed to each asset for FY2026, year to date to Nov 23, 2026, alongside the cost of its completed work orders. Every figure follows the site selector at the top. Tap an asset row to open its record.

Spend by Asset

Purchases attributed to the asset, plus the cost of its completed work orders — two views of the same money, shown side by side

Work Order Costs

Financials · The cost of completed and closed work orders for FY2026 — parts + service, locked when each job was marked Complete. Work order cost is attribution (where money already expensed at purchase ended up), never a second expense. Every figure follows the site selector at the top. Tap a job row to open the work order.

Completed Work Order Cost

Total = parts + service, locked when a job is marked Complete

Work Order Costs — Completed & Closed Jobs

Each completed job's total cost is its parts cost + service cost, recorded on the work order

Expense Ledger

Financials · The purchase expense ledger for FY2026 — every received purchase expensed at purchase, ex-HST, under its Stock / Direct / Service category, with the Stores reconciliation and the storeroom-expense (cycle count difference) postings. Every figure follows the site selector at the top.

Purchase Categories — Stock vs Direct vs Service

Every purchase order line carries one category. Stock lines replenish Stores and are picked from the Parts Master. Direct lines are bought for one job or asset — rentals, inspections and one-off parts with no SKU — and charge straight to that work order's asset and area. Service lines are external labour / service for one job — no SKU, no stock effect — and on receipt they charge that job's service cost, so a work order's service figure always traces back to its PO. All are expensed in full at purchase.

Stores Credits & Storeroom Expense

Stock in, issues out to work orders, and cycle-count differences posted to Storeroom Expense

Purchase Expense Ledger — Expensed at Purchase

Amounts are ex-HST. Draft and Submitted POs are commitments, not expense — they enter this ledger only when received. Receiving a PO on the Purchase Orders page adds its lines here automatically, at the price paid, under their Stock / Direct category.

Technicians

Maintenance staff across 5 sites and three shifts · 6 on day shift shown today. Active-job counts follow the site selected at the top.

Company & Access

How sign-in is structured: the company is the top level, sites sit under it, and every user is assigned to one company with access to one or more of its sites. Changing a user’s sites here changes what they can see everywhere — and is written to the Action Log. Each user carries exactly one position — Corporate (sees all sites), Controller (company-wide finance; holds budget editing and is the only one who can assign it to other users), Site Lead (their factory’s dashboard), Planner, Purchaser, Storekeeper or Technician — that tailors their home screen and screen defaults. Company Admin is separate from position: it is an on/off toggle on each profile, and only a signed-in user with the toggle on can change positions, site access or admin toggles here. Position and admin changes are logged. Budget editing is its own per-user toggle on each row below: the Controller position has it inherently, everyone else starts with it off, and only a signed-in Controller can switch it on or off for anyone — grants and removals are logged too.
Level 1 · Top level
Company — Northgate Foods Inc.
Code NFI · Food packaging · Head office North Bay, ON. A user belongs to exactly one company and can never see another company’s data.
Level 2 · Under the company
Sites — 5 plants
North Bay · Toronto · Montreal · Calgary · Vancouver. Assets, work orders, PM plans, parts and the schedule all belong to a site inside the company.
Level 3 · Assigned per user
Users — 1 company, 1+ sites
Each user is assigned to the company, then given one site, several sites, or every site. The top site selector only lists the sites that user can access.

Your session

Signed in

Sites in Northgate Foods Inc.

Asset and user counts are live from the register

Users & Site Access

Preview as signs you in as that user so you can see their exact view. The Position dropdown on each row sets that person’s one position — and their home screen. Tap a site chip to grant or remove that site for a user (every user keeps at least one site). The Company Admin toggle grants admin rights — it is not a position. Positions, site access and admin toggles can only be changed by a signed-in user whose own Company Admin toggle is on; every change is recorded in the Action Log under your name. The Budget editing toggle on each row works differently: only a signed-in Controller can change it — for everyone else it is read-only.

Access rules

  • One company per user. The company is fixed by the user’s assignment — it is not chosen at sign-in, and there is no way to switch companies from inside the app.
  • Sites are the permission. A user with one site sees only that site; a user with several can use “All my sites” or narrow to one. Sites they don’t have simply don’t appear — in the selector, counts, lists, Gantt or search.
  • Company Admin is a toggle, not a position. Any user can be given admin rights with the Company Admin toggle on their row — Jeremy Brown starts with it on. Only a signed-in admin can change positions, site access and admin toggles, and the last admin’s toggle cannot be switched off, so the company always keeps at least one admin.
  • One position per person. Corporate sees every site; the Controller gets the finance home and holds budget editing — and is the only one who can assign budget editing to other users; a Site Lead’s dashboard is their own factory; Planner, Purchaser, Storekeeper and Technician each get the home built for their work. A profile shows only that one position — admin rights appear as a separate “Company Admin” tag when the toggle is on.
  • Budget editing is assigned by the Controller. The Controller position carries budget editing inherently; every other user starts with it off. Only a signed-in Controller can switch a user’s Budget editing toggle on or off — including their own, since the assigning right comes from the Controller position itself, so a Controller can always switch their own back on. Users with budget editing on see Set Budgets on the Budgets page and save directly; everyone else sees a note there instead of the button. Grants and removals are written to the Action Log.
  • Everything is logged. Sign-ins, user switches, site changes and access changes are written to the Action Log with the user, company, site and time.

Action Log

A background record of what happened in MaintBookPro — written automatically as people work. Every entry is stamped with the user who did it, their company, the site in context and the time. Entries are a record: there are no edit or delete controls.

Document Library

The controlled documents for working in MaintBookPro — a process flow for every position and a work instruction for every key activity. Every document describes the app as it actually works: the gates, role restrictions and records are the ones built into the screens. All documents are Rev 1.0 · Nov 25, 2026.

Training Modules

One module per position. Work through the lessons — each one links to the process flow and work instructions it teaches — then pass the Knowledge Check (every question right; retries allowed) to mark the module complete. Completion is recorded per signed-in user and written to the Action Log.

About MaintBookPro

The product, who it serves, and the walkthrough, presentation and brochure that tell the story.

MaintBookPro

An industrial CMMS (computerised maintenance management system) built for multi-site plants. MaintBookPro keeps work orders, preventive maintenance, parts, purchasing and maintenance money in one place — so a job, the parts and service it needs, the purchase order behind them and the cost they land are all traceable on a single record, from the plant floor to the buyer's desk.

Demonstration data: everything you see in this app — Northgate Foods Inc., its five plants, assets, work orders, people, parts and figures — is demonstration data created to show how MaintBookPro works. It is not a real company's live maintenance record.

Who it's for

Maintenance teams in multi-site plants — one system, four working views of the same jobs

Planners & managers

See the whole board across every site they can access — what's down, what's overdue, what's coming from PM plans, and what it is all costing against budget.

Technicians

Open a job and get the full story in one place: problem, safety and lockout notes, tasks, the parts required with quantities issued and outstanding, and locked notes as the work progresses.

Stores

Hold the parts master with bin locations, min / max levels and last-purchase prices, issue parts to jobs at the right cost, and keep the record honest with cycle counts.

Buyers

Work from one list — Requirements Awaiting PO — covering short parts and external service alike. Raise the PO from the requirement itself, and every job it covers updates.

What it does

The feature story, as it works in this app today
PM

PM / CB / BD work orders — with live material status

Every job is categorised by how it was created: PM preventive maintenance from a plan, CB condition based from an inspection finding, BD breakdown. Each job rolls its requirements up into one live material status — Ready, On Hand, Open Requirement or On Order — and completed jobs must be reviewed and closed within 30 days.

02

PM plans that generate work ahead

Calendar, run-hour, temperature and measurement plans sit on assets and generate their work orders automatically. Recurring jobs are created ahead of time — inspections at least 4 weeks ahead and PMs that need parts at least 8 weeks ahead — so parts can be ordered before the job lands.

03

Parts & Service Required — buyer flow & PO traceability

Parts and external labour live in one requirements table on the job, with Qty Required, Qty Issued and Qty Outstanding in the same row. A fully issued line is never a shortage. Tick External labour / service required and the service becomes a requirement the buyer must cover with a PO — a service cost is never left without its PO reference.

04

Parts, purchase orders & cycle counts

A central parts master for all sites, purchase orders in Stock / Direct / Service lines, and a Requirements page — Requirements Awaiting PO — for the buyer. Cycle counts verify Stores on a rolling programme — every part counted at least once every 12 months — and posting a count adjusts stock to what was actually on the shelf.

05

Financials — its own category, five pages

Budgets (FY budgets by area), Spend by Area, Spend by Asset, Work Order Costs, and the Expense Ledger — each on its own page under the Financials heading. All parts are expensed once, at purchase; work order cost (parts + service) is attribution, locked when a job is marked Complete — the two are never added together.

06

Gantt schedule

Assets down the side, time across the top — Days, Weeks or Months. Solid bars are scheduled work orders coloured by category; dashed bars are the PM jobs plans will generate, so clashes and pile-ups show before they happen.

07

Company & site access

The company is the top level, sites sit under it, and every user belongs to one company with access to one or more of its sites. Sites a user doesn't have simply don't appear — in the selector, counts, lists, schedule or search.

08

Action Log

A background audit trail written automatically as people work — sign-ins, job and task changes, readings, issues, POs, counts, budget and access changes — each stamped with the user, company, site and time. Entries cannot be edited or deleted.

Walkthrough, presentation & brochure

Play the walkthrough, present the deck, or take the brochure with you
MaintBookPro
Product walkthrough
Paused
JBCO logo
MaintBookPro
An industrial CMMS for multi-site plants.
Work OrdersParts & StoresPurchasingFinancials

Maintenance Dashboard

North Bay Line 2 is down. Flow wrapper sealing jaw failure — BD-2481 in progress, ETA back in service 2:00 PM. All other packaging lines running.
Active Jobs
—
across 5 sites
Overdue Jobs
—
oldest: flow wrapper sealing jaw failure
Unplanned Downtime (last 7 days)
— hrs
unplanned · North Bay is 41% of it
MTTR (last 30 days)
3.2 hrs
down 18% vs last quarter
PM Compliance
—%
on target — goal 92%

Downtime by Site — Last 7 Days

Work Orders

Work OrderCategoryStatusMaterial StatusDue

BD-2481 — Flow Wrapper Sealing Jaw Failure

#TaskDoneCompleted By
1Make safe, inspect & record the as-found condition
Lockout LOTO-114 applied · hot jaw — allow to cool before handling
✓Mike Chen
Nov 23, 2026
2Flow wrapper sealing jaw failure — packs not sealing✓—
3Test, hand back & close out✓—
ON HANDAll requirements satisfied — 2 parts required, 1 already issued from Stores, the rest on hand in Stores · external service received (PO-8816)

Parts & Service Required

Part RequiredTypeQty ReqQty IssuedQty OutstBinMaterial Status
Sealing jaw set SJ-NBL2
$486.00 charged · Stores credited
STOCK1 kits1 kits0A-01-B-12ISSUED FROM STORES
Heat-seal Teflon tape — 2 rollsSTOCK2 rolls02 rollsL-01-A-05MATERIAL ON HAND
OEM sealing-jaw technician call-out & calibration
Syntegon Packaging · $195.00
SERVICE1 job—0—SERVICE RECEIVED PO-8816
Parts $486.00Service $195.00 — PO-8816 (Received)Total cost — so far $681.00

PM Plans & Schedule

PM-NBL2-01RUN-HOUR
Flow wrapper service — jaws, knives & film transport
Run hours since last service — 472 of 500 hrs · M. Chen
PM-NBCIP-01CYCLE COUNT
CIP system — 1,000-cycle service plan
Generated PM-2468 · spray balls & door gaskets · R. Patel
Generated Ahead Inspections — 4 weeks ahead PMs with parts — 8 weeks ahead

Schedule — Days View

NB-L2 Flow Wrapper
NB-L1 VFFS Bagger
NB-BLR Boiler
NB-CIP System
Solid = scheduled work order · Dashed = PM job a plan will generate

Material Master List & Requirements

PartInternal Part #BinOn HandMinReorderMax
Sealing jaw set — NB-L2 flow wrapperSJ-NBL2A-01-B-121 kits124
Photo-eye sensor PE-44PE-44C-02-B-120 pcs236
Desiccant cartridge — dryer NB-AIRDC-NBAIRA-01-A-074 pcs126

Requirements Awaiting PO — For Buyer

— waiting

Financials · Budgets — FY2026

Budget by Area — % Used

Expensed at Purchase — YTD
—
of budget used
Completed WO Cost
—
parts + service · locked at Complete
Stores Credits
—
issued from Stores to work orders
JBCO logo
Every job, part and dollar traces back.

Scene 1 of 8
Walkthrough

Product Walkthrough — MaintBookPro

Eight scenes through the app's real screens: the dashboard, the PM / CB / BD board, one job's full record (BD-2481), PM plans and the Gantt, Stores and the buyer's list, and the Financials category's Budgets page. It plays on its own when you open this page — hover or tap the stage to pause it, or step through with the controls.

PowerPoint
9 slides · .pptx
Presentation

PowerPoint Presentation — 9 slides

The deck version of the story — the problem, the work order board, PM plans, the buyer flow, the Financials pages and access — ready to present or send on.

Download PowerPoint
maintbook-industrial-presentation.pptx
Brochure
PDF · 6 pages
Brochure

Product Brochure — PDF, 6 pages

The printable leave-behind: what MaintBookPro is, who it's for, and how work orders, parts, purchasing and budgets connect — in six pages.

Open / download brochure
maintbook-industrial-brochure.pdf

The Northgate Foods company, sites, people and figures shown throughout this app are demonstration data.

MAINTBOOKPRO — a JBCO Solutions inc. Product. Sample plant data shown for demonstration.